You are here

SHIPYARDS

Equipped With Very Advanced Infrastructure :

  • n°1 – floating dock – 10000 tons capacity
  • n°2 – floating dock – 20000 tons capacity
  • n°3 – slipway-300 -tons capacity
  • n°4 – slipway-80 -tons capacity
  • 400 m alongside the repair quay of 6.0 m long
  • Electric supply 380,440 v; 50 or 60 Hz; 300 kva
  • 100 T, 60 T, 15 T crane, etc.

Few Data On Carena :

  • Turnover EUR 36 000 000
  • 1 500 000 hours worked per year
  • Up to 1,000 workers per day
  • A strong network of local subcontractors

Activities:

  • Boilerwork workshop
  • Piping workshop
  • Mechanical workshop
  • Machining and machine tools workshop
  • Stripping and painting workshop
  • Electricity workshop
  • Liferafts revision station
  • 500 Tons of permanent stock of certified marine quality steel

Services By Category :

Oil and gas - offshore /  60 per cent of the activities of Carena

  • S1. Supply Vessels, Barges, Crewboats, seismic research vessel  
  • Bourbon, Tidewater, Swire, Siem, Seacor, Maersk, Smit-Lamnalco, Boskalis, KCA Deutag…

Tuna fishing /  25% of the activities of Carena

  • Tuna boat, Liner, fridge
  • CFTO, Saupiquet, TTV, Albacora, Calvopesca, Atunsa, Panofi, Dong Wong, …


Cargo /  15% of the activities of Carena

  • Oil cargo
  • Sea Tankers, Norbulk...