You are here

Back to top

Creation of a mineral terminal

Error message

  • Warning : file_exists(): open_basedir restriction in effect. File(/jquery.imagesloaded.min.js) is not within the allowed path(s): (/var/www/vhosts/portabidjan.ci/:/tmp/) dans template_preprocess_field_slideshow() (ligne 907 dans /var/www/vhosts/portabidjan.ci/httpdocs/sites/all/modules/field_slideshow/field_slideshow.module).
  • Warning : file_exists(): open_basedir restriction in effect. File(/jquery.imagesloaded.js) is not within the allowed path(s): (/var/www/vhosts/portabidjan.ci/:/tmp/) dans template_preprocess_field_slideshow() (ligne 908 dans /var/www/vhosts/portabidjan.ci/httpdocs/sites/all/modules/field_slideshow/field_slideshow.module).
  • Notice: Undefined index: main-menu in menu_block_view() (line 510 of /var/www/vhosts/portabidjan.ci/httpdocs/modules/menu/menu.module).
  • Notice: Undefined index: main-menu in menu_block_view() (line 510 of /var/www/vhosts/portabidjan.ci/httpdocs/modules/menu/menu.module).

PROJECT DESCRIPTION

  • Construction of new wharves
  • Backfill of 9 ha of pier
  • Wharf Repairs 13 and 14 Storage Area Expansion
  • Installation of conveyor belts

EXPECTED RESULTS

  • Ability to accommodate conventional vessels with a draft of 13.5 m
  • Enable operators to achieve economies of scale on extra port costs
  • Increase the competitiveness of the Port of Abidjan
  • Have storage space