You are here
Back to topA WORKING MISSION OF WORLD BANK TO ABIDJAN PORT
Error message
- Notice: Trying to access array offset on value of type null in field_formatter_settings_get_instance_display_settings() (line 34 of /var/www/vhosts/portabidjan.ci/httpdocs/sites/all/modules/field_formatter_settings/field_formatter_settings.module).
- Notice: Trying to access array offset on value of type null in field_formatter_settings_get_instance_display_settings() (line 34 of /var/www/vhosts/portabidjan.ci/httpdocs/sites/all/modules/field_formatter_settings/field_formatter_settings.module).
- Notice: Trying to access array offset on value of type null in field_formatter_settings_get_instance_display_settings() (line 34 of /var/www/vhosts/portabidjan.ci/httpdocs/sites/all/modules/field_formatter_settings/field_formatter_settings.module).
- Notice: Undefined index: main-menu in menu_block_view() (line 510 of /var/www/vhosts/portabidjan.ci/httpdocs/modules/menu/menu.module).
- Notice: Undefined index: main-menu in menu_block_view() (line 510 of /var/www/vhosts/portabidjan.ci/httpdocs/modules/menu/menu.module).

Visite de travail
Monday 28 November 2016
A WORKING MISSION OF WORLD BANK TO ABIDJAN PORT
On Wednesday 09th November 2016, a delegation of World Bank’s experts led by Mrs. Anne Cecile SOUMA paid a working visit to Abidjan Port Authority. The delegation was received by Mr. GBALA Etienne, Deputy Managing Director representing Mr. Hien Yacouba SIE, Managing Director. The working session was aimed at presenting the major development projects, namely the projects under way with a view to obtaining financing. The presentation focused on projects pertaining to the construction of the future grain terminal, road works and access bridge, as well as the PK 24 logistic platform. After fruitful and promising exchanges the World Bank’s delegation went on a tour of the port facilities


